[Wouter] RB50 Bad Spendau - Querleben (2008)

  • by Wouter
  • 1 upvote
  • Downloaded 84 times

In this scenario you will drive a BR218 with 3 N-Wagen, from Bad Spendau to Querleben, stopping at most stations. Most of the platforms are short, so precise braking is important. The scenario will take approximately 40 minutes to complete. For this scenario, I made up a little 'story' to match the setting:
September 2008 marks the final months of DB Regio operation on the RB50 Bad Spendau - Querleben line. Starting with the new 2009 timetable, ODEG will take over with Stadler RS1's and GTW DMU's, replacing the beloved 218 + N-wagen diagrams. However it is not (yet) time for the 218 to fully pack up, as the RE11/21 will continue to use 218 until at least 2013.
Route: Nachteburg - Rannstadt v1.4

Requirements

Please consult the manual included in the download for a full list for all requirements, including links to their respective download pages. Additionally: AP Sky & Weather EP is used, but not required for the scenario to function.

Installation Instructions

Method 1. Install the .rwp file using Utilities.exe.
Method 2. Open the file with 7zip, WinRAR or similar, and drag the Content folder into the main RailWorks folder.

Additional Comments

For some, Nachteburg - Rannstadt might be particulary crash-prone (It is for me). However I have found loading TestTrack (since it's very fast to load) before entering the scenario pretty much eliminates any crashing. If you experience crashes, try loading something else first.

Files

[Wouter] RB50 Bad Spendau - Querleben (2008).zip 5 MB · Added 19 Feb 2024 · Downloaded 28× Manual RB50 Bad Spendau - Querleben.pdf 5 MB · Added 19 Feb 2024 · Downloaded 56×

Comments

Nobody has commented yet.

Add a comment

If you wish to leave a comment, please log in .

About this mod

Created
19 Feb 2024
Updated
19 Feb 2024
Game
Train Simulator Classic
Type of content
Scenario
Geographical area
Germany