In this scenario, You are in charge of operating Pacific Surfliner 571, a weekend limited service from San Diego to Los Angeles. You will run as far as Oceanside in Part 1. Due to a failed HEP generator on the 462 on the previous trip, You will be powered by a Dash 8 on both ends of the train as the 510 was the San Diego Protect engine. 510 tho has a record of not having a good HEP. Good Luck! Maybe 509 is your lucky charm.
Tags: amtrak amtrak-p32-8bwh
While not required, it's good to have these EPs as well
Required for the Amfleets in the consist
Required for the Phase IV Dash 8 leader
Required for the other surfliner consist you'll meet enroute
Required for the Horizon Cars on the consist
All three rolling stock packs are required for the freight trains to work
Required for this scenario as this uses the 'SurfUp' revamp route. Also required is the requirements for this revamp.
Required for the Amfleets to work
Required for the Horizons to work
Required for the P42 and Superliner on an AI consist
Required for the Dash 8s to work
Required for the Metrolink consist at Oceanside to work.
Required for Rolling Stock and Route to work.
Required for the Coaster Equipment to work
Drag the "Contents" folder provided within the folder to your RailWorks folder.
If you have any issues, feel free to leave a comment below
Loading comments…