This timetable simulates the operations on the Marseille to Avignon route as of February 2026. All passenger traffic is simulated. Because there is not much french rolling stock available i had to be creative in substitutions (also regarding the 1,5kV DC electrification).
- TGV Duplex is used for all TGV operations and OUIGO operations.
- Trenitalia is also substituted with TGV Duplex
- Renfe traffic is substituted by ICE3M (Mannheim-Kaiserlautern required)
- Intercite traffic and TER traffic bound for Nice is substituted by Vectron with IC Expert Coaches (Frankfurt Fulda and BR101 Expert required)
- Diesel powered TER traffic is substituted by Class170 from FifeCircle
- Other TER traffic is substituted by Dutch IC or SNG trains Zwolle-Groningen required
Known issues
- Custom Station Directory is WIP
- No cargo traffic
Loading comments…