Slight Improvement on the CR logo was made
ND5 Patch II was improvede version of ND5 Patch I based on the experience of Patch I in use in CR. This one is the 0422 in Railway Museum.
Patch II has various improvements. Most importantly, 330hp was added at P8 of Throttle as Patch I's hp was cauculated in different method between GE and CR. Patch II also feature a larger window at front to improve visual. The toilet was removed for space of ATS system, LKJ Cab Signal System and Onboard Radio for Signaller Contact. The handbrake was moved inside cab to prevent it from being reached by people near railway.
Tags: china china-railway nd5-2 sd40-2
Sand Patch Grade (SPG) DLC
Raging Lighting's TSW2 Livery Manager
See this video:
Loading comments…